145
Egbin Power Plc is one of the largest power generating station in Nigeria with an installed capacity of 1,320 MW consisting of 6 Units of 220MW each
Applications are invited from suitably qualified candidates to apply for the 2025 Internship program.
Internship Application Summary:
Egbin PowerUp Internship Experience equips students to bridge the gap between theoretical knowledge and practical application, also enhancing their skills, building their confidence, and sharpening their creativity and problem-solving abilities.
This Internship runs from January -June 2025
Field of Study:
- Engineering
- Chemistry
- Computer Science
Requirements
- Applicants must be Students on a second class upper (2:1) or its equivalent as the time of submitting this application.
Method of Application
Interested and qualified candidates Should;
CLICK HERE TO APPLY.