Egbin Power Plc is the largest power generating station in Nigeria with an installed capacity of 1,320 MW consisting of 6 Units of 220MW each
Applications are invited from suitably qualified candidates to apply for the 2026 Internship program.
About the Egbin Power Plc Internship Programme
Egbin PowerUp Internship Experience equips students to bridge the gap between theoretical knowledge and practical application, also enhancing their skills, building their confidence, and sharpening their creativity and problem-solving abilities.
This Internship runs from July – December 2026.
Eligibility Criteria:
Applicants must be Students on a second class upper (2:1) or its equivalent as the time of submitting this application.
Field of Study:
- Mechanical Engineering
- Electrical Engineering
- Mechatronics Engineering
- Chemistry/Chemical Engineering
- Computer Science/ Computer Engineering
Method of Application
Application Deadline: 16th June, 2026
Discover more from Area Talk Report
Subscribe to get the latest posts sent to your email.